South Africa has recorded a landmark 160 days with no load-shedding, the longest period in over four years, and is on track for a load-shedding free winter. However, maintaining future grid stability will require a doubling down on wind investment as well as higher spending on transmission infrastructure, says local renewable energy developer Red Cap. Mark Tanton, CEO at renewable energy developer Red Cap.